Production line

1. Chassis connected.

2. Install the compressor.

3. Install the evaporator and condenser.

4. Piping connection

5. Leak detection: fill with nitrogen and identify leaks.

6. Insulate the pipe and the compressor silencer with cotton.

7. Install the motor, fan blades, brackets, and reactors.

8. Intubation of the warm wire, wiring, control, and installation of fuselage parts.

9. Vacuuming and refrigerant charging.

10. Safety check and operational testing.

11. Attach the panel label and accessories.

12. Packaging
① Put on the packaging bag and wrap the top and corners of the machine with sponge.
② Pack in wooden boxes and place them in storage.